Prime cost plus factory overhead gives:
Take Free Practice Test On 2026 JAMB UTME, Post UTME, WAEC SSCE, GCE, NECO SSCE
Correct Answer: Option D
Explanation:
Factory overhead is added to prime cost to determine the total factory cost of production.