The addition of prime cost and factory overhead is

The addition of prime cost and factory overhead is
Take Free Practice Test On 2026 JAMB UTME, Post UTME, WAEC SSCE, GCE, NECO SSCE
  • A Total factory overheads
  • B Market value of goods produced
  • C Cost of goods produced
  • D Work-in-progress
Correct Answer: Option C
Explanation:
The cost of goods manufactured equation is calculated by adding the total manufacturing costs; including all direct materials, direct labor (prime cost) and factory overhead; to the beginning work in process inventory and subtracting the ending goods in process inventory.