The addition of prime cost and factory overhead is
Take Free Practice Test On 2026 JAMB UTME, Post UTME, WAEC SSCE, GCE, NECO SSCE
Correct Answer: Option C
Explanation:
The cost of goods manufactured equation is calculated by adding the total manufacturing costs; including all direct materials, direct labor (prime cost) and factory overhead; to the beginning work in process inventory and subtracting the ending goods in process inventory.
The cost of goods manufactured equation is calculated by adding the total manufacturing costs; including all direct materials, direct labor (prime cost) and factory overhead; to the beginning work in process inventory and subtracting the ending goods in process inventory.