A plank is placed along the path on which a wheel barrow containing sand is pushed at a construction site to prevent it from sticking as illustrated in the diagram given. The large area of the plank prevents the wheel barrow from getting stuck by
Take Free Practice Test On 2026 JAMB UTME, Post UTME, WAEC SSCE, GCE, NECO SSCE
Correct Answer: Option C
Explanation: